The enterprise needs to pay attention to solar pv stents five heavy risk
This website list several risky of PV stent industry and provide reference for the enterprises who has plan to get in. Hope your understand if not so thoughtful.
2, Long transport time: More than 70% of the domestic project focused on Qinghai, Gansu, Xinjiang, Inner Mongolia, Ningxia and other western areas (ignoring the enterprise who have factory in the Westen of China). It need at least 2 thousand kilometers, even 3-4 thousand kilometers from the eastern or central transported to the site. Not only freight is quite high, but also the journey time is long, which will affect the arrival time.
4, Uncontrollable risk: Photovoltaic industry are greatly affected by national policy. whether it can connect the grid or not , When to connect the grid, when will get the subsidies? These matters are all decided by the state. How can the bracket manufactures get the money on time when the investors and EPC out of control by these?
5, Unable to do inventory: have you found that? You signed the contract project is very, very urgent and customers require you to delivery the goods within a week. But normally each project is different (Angle is different, the design is different, the material is different, different configuration, etc.), all big products you can't do inventory, and it will directly affect the production scheduling.
The industry, In conclusion is: too much receivables, low profit margins. Temporarily these points, welcome fellow added.
-
(1).jpg)
Vientos de 60m/s no son problema: El sistema de doble columna de Grace Solar revoluciona la energía solar europea
2025-04-15 -
.jpg)
Revolución Solar Europea: Sistema de Montaje Doble Columna Resiste Vientos de 60m/s y Acelera Instalaciones 50%
2025-04-15 -
(1).jpg)
Revolución Solar Australiana: Estructura de Aluminio China Resiste Ciclones y Reduce Tiempo de Instalación 50%
2025-04-14